The start of the hickory flooring in the living room. Massive frustration that the boards weren't milled as precisely as the bamboo I was used to. Once I got over that, the net effect is really neat. |
![]() |
Thanks to dad and Amy we finished wrapping the beam between the kitchen and dining room. |
![]() |
Finally got around to laying the tile for the wood stove hearth. With some minor adjustments to grout widths, the 6x4 tile grid fit perfectly in the space I left in the bamboo flooring. |
![]() |
While I was in tiling mode I did the basement/garage landing as well. |
![]() |
Amy contemplating the layout. Notice the undercounter oven sitting on the floor in the foreground and not in its place next to the sink... more on that later. |
![]() |
The oven and dishwasher installed. Still trying to figure out what to do about the dishwasher since there's no side panel on the edge of the sink, so there's nothing to screw to to anchor it. |
![]() |
The hickory flooring in the living room complete. Had to scribe and notch every course along the front and sides of the stone hearth. Now I know why people usually use square bricks. |
![]() |
The scribed piece of baseboard where it met the fireplace. |
![]() |
The wood stove hearth grouted and done. |
![]() |
Our mail forwarding request expired, so we put up a temporary mailbox. |
![]() |
And Ella got our first mail at the new house! |
![]() |
With the kids out of town.... finished the boxed beam in the family room. |
![]() |
Started the archway (enough to be able to lay the family room flooring). |
![]() |
Stapling down the underlayment in preparation for the floor. |
![]() |
The archway in progress. |
![]() |
About half way done with the floor. The buckets of flooring adhesive didn't cover as much as advertised, so Amy had to make two trips to Lumber Liquidators during the day to keep things rolling. |
![]() |
We laid the entire floor in one day. So no need to deal with dried hardened adhesive on day 2. |
![]() |
Measure twice. |
![]() |
Cut once. |
![]() |
While I worked on trim, Amy installed every outlet and switch cover in the house. |
![]() |
Building the IKEA cabinets. |
![]() |
Amy also took on the coveted task of scraping the plaster from the floors upstairs to prep for laying the wide pine. |
![]() |
She took some time out to catch some rays. Not quite York Beach, but it'll do. |
![]() |
Installing the last piece of trim in the archway. |