In the 2+ weeks since my last post a lot has changed. I finished my last day at Belmont, cleaned out my room, drove to Auburn and dropped off my boxes in my dad's... no, "my" room. Weird. Since then it's been 16 hour days every day. The past week, Sue took the kids to York, ME while Amy and I stayed behind and worked together every day. Here's the latest pictures:
|
The start of the hickory flooring in the living room. Massive frustration that the boards weren't milled as precisely as the bamboo I was used to. Once I got over that, the net effect is really neat. |
|
Thanks to dad and Amy we finished wrapping the beam between the kitchen and dining room. |
|
Finally got around to laying the tile for the wood stove hearth. With some minor adjustments to grout widths, the 6x4 tile grid fit perfectly in the space I left in the bamboo flooring. |
|
While I was in tiling mode I did the basement/garage landing as well. |
|
John came down for a day to help (and play golf). Just as we were getting going, the appliances showed up, so we spent a few hours unpacking and moving the fridge, stove, oven, and dishwasher. But after that, we go 2 of the 3 sides of the family room boxed beam done. |
|
Amy contemplating the layout. Notice the undercounter oven sitting on the floor in the foreground and not in its place next to the sink... more on that later. |
|
Anni and I took a trip to Lexington to buy some cabinets from Craigslist. We got 3 base cabinets (probably will be used in the laundry room for an ironing station) and a bunch of cherry shelving and crown mouldings. When we dropped them off she wanted to learn how to use the central vac. Looks like Amy has a new partner in housecleaning. |
|
The specs we gave Dean for the opening for the oven weren't for the oven we ended up buying. Luckily then width was the same. Unfortunately, the opening needed to be made taller. So I had to cut out the floor of the cabinet, drop it 3/4", rip down the base trim to get it to line up with the other sides, cut out 1/2" of the top trim, rebuild a support system for the floor, and reinstall it. Yuck. |
|
The range installed a little easier. The only issue was that I installed the power outlet in the only orientation that wouldn't allow it to be plugged in. I had to wrestle with the wiring for a while to reorient the receptacle. |
|
The oven and dishwasher installed. Still trying to figure out what to do about the dishwasher since there's no side panel on the edge of the sink, so there's nothing to screw to to anchor it. |
|
The hickory flooring in the living room complete. Had to scribe and notch every course along the front and sides of the stone hearth. Now I know why people usually use square bricks. |
|
The scribed piece of baseboard where it met the fireplace. |
|
The wood stove hearth grouted and done. |
|
Our mail forwarding request expired, so we put up a temporary mailbox. |
|
And Ella got our first mail at the new house! |
|
The basement was getting very damp, so I took the time to build a hanging shelf for the dehumidifier that lets it drain continuously into the sewer. Very convenient to not have to empty the bucket any more. |
|
With the kids out of town.... finished the boxed beam in the family room. |
|
Started the archway (enough to be able to lay the family room flooring). |
|
Stapling down the underlayment in preparation for the floor. |
|
The archway in progress. |
|
About half way done with the floor. The buckets of flooring adhesive didn't cover as much as advertised, so Amy had to make two trips to Lumber Liquidators during the day to keep things rolling. |
|
We laid the entire floor in one day. So no need to deal with dried hardened adhesive on day 2. |
|
Measure twice. |
|
Cut once. |
|
The floor complete, as viewed from the loft. We were so exhausted that the following day we cleaned up then took a trip to IKEA for mudroom cabinets. 7 hours later, we barely had time to pick up the cabinets as the store closed on us. That place is ridiculous. |
|
While I worked on trim, Amy installed every outlet and switch cover in the house. |
|
Building the IKEA cabinets. |
|
Amy also took on the coveted task of scraping the plaster from the floors upstairs to prep for laying the wide pine. |
|
She took some time out to catch some rays. Not quite York Beach, but it'll do. |
|
Installing the last piece of trim in the archway. |
|
93 individual pieces of wood, almost every one mitered and glued, the archway is complete! After dinner at Grandma Buzzy's last night we did a final clean-up downstairs and move the woodworking operation upstairs in preparation for the window trip up there. That's my goal for today... |
Wow - you guys are on fire. You look like flooring experts.
ReplyDeleteI love hickory floors. We have them too and they're so warm and beautiful. The place looks like it's really coming together. Can't wait to see the final "after" pictures.
April