- Picked up the "poop pump" on Wednesday.
- Jeff and Tom knocked down the dirt piles, graded the yard, connected the sewer line, and started digging the utility trenches.
- The roof is shingled.
- Plumbing fixtures have been picked out. I need to pick up the valves tomorrow to give to the plumber on Saturday when we meet to go over the locations of the fixtures.
- Joe is coming Saturday to level the low spots in the floor/beams. If the doors are in we may install a few as well.
- Steve came over tonight to measure up for the electrical service. Shopping trip to the HD tomorrow. 6AM Saturday we run the service line. He also managed to fix my generator in about 30 seconds while he was there.
- Things to do tomorrow: make sure trench gets dug so I can run the electric line Saturday, call the electric inspector to come on Monday, pick up the shower/tub valves for the plumber, buy the electric service supplies, make a few changes to the grading in the back yard, call Maki to see if the doors are ready for delivery, call Chace to check on siding delivery, finish milling the trim that I was just starting tonight when the generator ran out of gas - I can't wait to have real electricity!
Thursday, September 23, 2010
Sewage, Landscaping, and Electricity
Lots of developments: